AT Prime Engineering and Construction
AT PRIME Engineering and Construction was founded in 2019, created to satisfy the needs of the most demanding customers, who want to draw on our know-how of over 30 years in the engineering, plumbing and electrical sectors, made up of professional successes throughout the world, born to leave a tangible and lasting sign in a market that requires professionalism, quality and above all certainties. The Company headquarters are located in Beira, Sofala, Mozambique, but it plans to open a branch in Maputo. After several years in the Mozambican market with another reality that is still active, which is EU TECHNOLOGIES Lda, and that certainly is not destined to go out but rather to give its contribution to what will be from now on the leader of the group , we decided to found ALFATEKNA with the aim of adding to our past competences also what we had so far lacked, the building constructions, related to the execution of both industrial and civil systems.We also operates in the field of heavy industry with a primary focus on the installation of pipelines (Carbon Steel, Stainless Steel, Hastelloy, Fiber Reinforced Plastic & HDPE), the erection of tanks and pressure vessels, as well as the installation of pre-insulated pipes, insulation, and leak detection systems, the planning and execution of work strictly follow the highest international standards of quality, safety, and hygiene. With the foundation of AT. PRIME, we have joined our staff members and new technicians, with proven experience also for the construction sector, thus completing our construction capabilities for the industrial sectors of Food Industries, Paper Technologies, Water Treatment (WWTP & WTP), Oil & Gas and of the Energy, but also in the civil installations both electric, hydraulic and of the domotics. Our Slogan is:
FOR US NOT MATTER HOW DIFFICULT IS, ONLY THAT MATTER IS POSSIBLE."
Milestones
Our Company Has Accomplished So Far
Welding of more than 350 000 diameter inches in various types of steel.
Errection of metal structures of more than 8000 Tons.
Welding of more than 250 kilometers of underground pipelines.
Installation of more than 30 000 electrofusion fittings for pre-insulated pipelines.
Erection of more than 8 500 tons of electromechanical equipment.